The tank based sesame processing and tahini production line is offered as a turnkey system, with a capacity of up to 500 kg per hour. Sesame is soaked for 4–5 hours before dehulling. The line includes a soaking tank, screw conveyor, dehuller, salting tank, transfer robot, one or two washing tanks depending on capacity, a centrifuge, roasters, a sieve and tahini mills. Roasting options include rotary machines using gas, liquid or solid fuel, or horizontal or multi deck roasters using steam or thermal oil. The space requirement for a 500 kg/hour plant is a 300 m² floor area with 4 m height; requirements vary with capacity.
#EYGmakine #SesameProcessingLine #TahiniProduction